MEDIA

MEDIA

View press releases below.

Final Engineering Assessment Report of Draft Tube 2 Formwork Falsework


 

Astaldi Releases Final Engineering Investigation Report on May 2016 Draft Tube Incident

Date: May 1st, 2017

Abstract: Astaldi has released the ILF Consulting Engineers’ report on the May 29, 2016 Draft Tube 2 formwork and falsework incident at the Muskrat Falls project and it has filed it with the Professional Engineers and Geoscientists of Newfoundland and Labrador (PEGNL).

Download Release